Installation, Vent natural propane top rear – Harman Stove Company HB 38 DV User Manual

Page 26

Advertising
background image

26

INSTALLATION

Only For Qualified Installers

Remove Orifices with a 1/2” wrench
or deep well socket. The larger
orifice always goes to the front.

Remove three screws to change knob assembly. Install LP
knob assembly in place of the NG assembly. Be sure screws
are tight.

9

Replace Orifices with the proper
size shown in the Orifice Chart.

10

Vent

Natural

Propane

Top

Rear

Front

Rear

Rear

Front

31

51

32

51

52

59

52

60

Orifice Chart

Remove two screws and place
Control Panel to the left.

11

12

13

Read instructions packed with LP Change-over Kit.

Place conversion sticker (provided in Kit) on bottom of
valve. This is to permanently mark the valve that it has been
converted to LP. This label is important in the event that the
valve is ever removed and mixed in with other valves.

14

Mark the proper box on the control panel with a permanent
marker. Note: If no conversion is made, the box for the
proper fuel must still be marked.

15

Note: The higher the orifice number the smaller hole in the
tip. For example, a number 52 oifice has a larger hole than
a number 60 orifice.

Advertising