Enroute, Reviewing flight plan progress, Reviewing afis planned leg data – Honeywell GNS-XL User Manual

Page 294

Advertising
background image

7-28

GNS-X

L

Flight Management System AFIS Operation

Rev. 0

Oct/96

4. FPL Date - VERIFY.

5. ENT Key - DEPRESS.

NOTE: If an Active Flight Plan exists, the message REPLACE
ACTIVE FPL?
appears. DEPRESS ENTER to replace the Active
Flight Plan with the AFIS Flight Plan.

6. ACTIVE FPL - CONFIRM. AFIS Flight Plan becomes the Active

Flight Plan. The initial leg must be established on the NAV Page
so the system can navigate normally.

ENROUTE

REVIEWING FLIGHT PLAN
PROGRESS

1. NAV Key - DEPRESS until

NAVIGATION

Page 5,

Flight Plan Progress Page
appears. (Figure 7-41)

2. Current Leg Data - CON-

FIRM. Observe AFIS
Planned data vs. Actual
GNS-XL calculated data.

REVIEWING AFIS PLANNED
LEG DATA

3.

Line Select Key -
DEPRESS to position cur-
sor over Leg Identifiers.
(Figure 7-42)

NOTE: ACTUAL data fields
become dashes, F REM field
becomes F REQ and ETA field
becomes ETE.

4. ENT Key - DEPRESS to

review Planned data for
future legs of the Active
AFIS Flight Plan.

5. BACK or PRV

Key -

DEPRESS to review
Planned data for previous

NAVIGATION 5/5

<

PRC

:

GUP

FL410

PLAN

ACT

F REM

9642

9685

FF P/E

1832

1800

ETA

02:09

02:08

TAS

488

485

GS

507

519

WIND

300/ 26

310/ 38

Figure 7-41

NAVIGATION 5/5

<

PRC: GUP

FL410

PLAN

ACT

F REQ

1330

------

FF P/E

1832

----

ETE

0+22

-----

TAS

488

---

GS

507

---

WIND

300/ 26

---/---

Figure 7-42

NAVIGATION 5/5

<

DIR TO

ICT

FL---

PLAN

ACT

F REQ

------

9475

FF P/E

----

1800

ETA

-----

03:17

TAS

---

485

GS

---

491

WIND

---/---

310/ 38

Figure 7-43

Advertising