Installation – Honeywell PERFECT WINDOW HR200 User Manual

Page 12

Advertising
background image

MOUNTING

When Installing this Product…

1. Read these instructions carefully. Failure to follow these instructions could damage the product or cause a
hazardous condition.
2. Check the ratings on the product to make sure the product is suitable for your application.
3. Installer must be a trained, experienced service technician.
4. After installation is complete, check out product operation as provided in these instructions.

CAUTION: Electrical Shock Hazard.
Can cause personal injury or equipment damage.
Disconnect power supply to prevent electrical shock or equipment damage.

Unpacking Fresh Air Ventilation System

Check that all the components are included. The Fresh Air Ventilation System is shipped assembled. The carton
contains the following:

Fresh Air Ventilation System.

Vibration isolation straps (4).

Drain fittings (2) and T fitting (1).

Literature package.

Except for the mounting hardware and drain fittings, the ventilator is ready for installation. Wiring, drain
connections and ducting are required to complete the installation.

Mounting

Suspended from Floor Joists

Mount the four vibration isolation straps (provided) to the side of the ventilator using the mounting screws located on the

1.

cabinet. See Fig. 23.
Securely fasten the other ends of the straps to the floor joists with wide-head nails (not supplied), making sure the unit

2.

is level. The straps are designed to reduce noise, resonance or harmonics; therefore, using the full length of the strap
between the ventilator and the floor joists is recommended.

NOTE: Removing door and core reduces the weight of the ventilator, making it easier to lift into place.

INSTALLATION

HR150, 200; ER150, 200 Perfect Window™ Fresh Air Ventilation Systems 68-0171—12

10

Advertising