Figure 5 proper wire preparation and insertion, Strip ¹-inch of insulation, Figure 6 wiring and assembling the digital gateway – Hach 6120118 User Manual

Page 12: Digital gateway front, O-ring, Sensor wire connector, Digital gateway back, Cable bushing, Anti-rotation washer, Cord grip

Advertising
background image

12

Installation

Figure 5

Proper Wire Preparation and Insertion

Figure 6

Wiring and Assembling the Digital Gateway

1.

Strip ¼-inch of insulation.

2.

Seat insulation against connector with no bare wire exposed.

1.

Digital gateway front

7.

Cord grip

2.

O-ring

8.

From sensor

3.

Sensor wire connector

9.

Insert wires into connector according to

Table 3

. Use the included 2 mm

screwdriver (Cat. No. 6134300) to secure connections.

4.

Digital gateway back

10. Screw back of digital gateway onto front.

5.

Cable bushing

11. Push cable bushing and anti-rotation washer into back.

6.

Anti-rotation washer

12. Fasten cord grip securely. Assembly is complete.

1

2

METAL BRAID

RED

WHT

BLU

CLEAR

1

6

5

4

3

2

9

10

11

12

7

8

Advertising