Checking off to do list items, Checking off a completed item, Changing priorities and due dates – Samsung 010505D5 User Manual

Page 199: Changing the priority, due date and category

Advertising
background image

Section 16

198

To Do List

Checking OFF To Do List Items

When items are completed, they can be checked off to indicate
the item has been completed.

Checking off a Completed Item

1.

Tap the check box located on the left side of the “To Do
List” item.

Note:

The To Do List can be set

to display or hide items

that have already been

checked off. By default,

completed items will not

be displayed but are

always stored until you

delete them.

Changing Priorities and Due Dates

You can change the To Do List to display the due date assigned
to an item, change its priority, and assign a category to the
task with the To Do Item Details dialog box.

You can then sort To Do List items by priority, due date, or
category.

Changing the Priority, Due Date and Category

1.

In the To Do List, tap the desired item.

2.

Tap the “Details” button.

3.

In the Details dialog box, tap the “Category” drop down
menu. Select the desired category, or create a new one.

4.

In the Details dialog box, tap the “Due Date” drop down
menu. Choose one of the following options:

Today

- Automatically inserts the date in the “Due Date”

field.

Advertising
This manual is related to the following products: