Step 10: bumper installation, 34 stellar cable hoist owner’s manual – Stellar Industries SI-60 User Manual

Page 40

Advertising
background image

34

Stellar Cable Hoist Owner’s Manual

Lighted Bumper Installation

1. Align the holes in the lighted bumper with

the holes in the hoist sub-frame apron.

2. Install six (6) 5/8NC x 1-3/4” GD.8 Cap

Screws, twelve (12) Flat Washers, and six (6)

Hex Nuts. Torque to specifications.

3. Install wiring harness P/N 38056 through the

access hole.

4. Install the bumper lights as shown on parts

pages 59-60.

5. Connect the female end of wiring harness

P/N 38056 to the male end of wiring harness

P/N 40310 as shown on page 42.

6. Check all light functions. Important: The

back-up alarm should sound when the

back-up lights are on.

Pintle Bumper Installation

1. Position the bumper weldment over the hoist apron and center.

2. Make sure bumper is level and tack weld into position.

3. Match drill all fender and pintle mounting holes through the hoist apron.

4. Weld bumper to apron per weld call-out shown.

5. Position and weld the reinforcement gussets as shown.

6. Check all light functions. Important: The back-up alarm should sound when the back-up lights

are on.

PN 46818

PINTLE BUMPER ASSEMBLY

HOIST APRON

PN 46822 GUSSET

SLIDE UNDER HOIST APRON

ON OUTSIDE OF FRAME RAILS

AND WELD SOLID

FRAME RAIL

1/4" FILLET WELD

1/4" FILLET WELD

1/4” FILLET WELD

4- ”

13

32

PINTLE BUMPER

INSTALLATION

Step 10: Bumper Installation

5/8" GRADE 8

5/8"NC X 1-3/4" GRADE 8

HEX HEAD CAP SCREWS

FLAT WASHERS

5/8" GRADE 8

FLAT WASHERS

5/8"NC SELF

LOCKING NUTS

LIGHTED BUMPER

INSTALLATION

Advertising
This manual is related to the following products: