Vtrak task list, Step 1: unpacking the vtrak – Promise Technology VTrak J610S User Manual

Page 2

Advertising
background image

VTrak J610s, J310s Quick Start Guide

2

VTrak Task List

Step 1: Unpacking the VTrak (below).
Step 2: Mounting VTrak in a Rack

•

VTrak J610s (page 5)

•

VTrak J310s (page 7)

Step 3: Installing Disk Drives (page 10)
Step 4: Setting Up Data Cable Connections (page 14)
Step 5: Setting Up Serial Cable Connections (page 20)
Step 6: Connecting the Power (page 21)
Step 7: Setting Up the CLI Connection (page 22)

Step 1: Unpacking the VTrak

The VTrak J610s or J310s box contains the following items:

•

VTrak J610s or J310s Unit

•

Quick Start Guide

•

Front bezel and key

•

RJ11-to-DB9 serial data cable
(Units with one I/O module: 1)
(Units with two I/O modules: 2)

•

1.0m (3.3 ft) SAS cable
(Units with one I/O module: 1)
(Units with two I/O modules: 2)

•

Screws for disk drives
(J610s: 70, including 6 spares)
(J310s: 50, including 2 spares)

•

Left and right mounting rails

•

Left and right center-mount brackets

•

1.5m (4.9 ft) Power cords (2)

•

CD with Product Manual and Quick
Start Guide

Warning

The electronic components within the J610s and J310s units are
sensitive to damage from Electro-Static Discharge (ESD).
Observe appropriate precautions at all times when handling the
J610s or J310s unit or its subassemblies.

Advertising
This manual is related to the following products: