Running the l-60 – Universal Scheu Company L60 User Manual

Page 19

Advertising
background image

Page 19

RUNNING THE L60

1. Turn the main switch ON (01).
2. Turn motor switch ON (02).
3. Connect air supply. CAUTION: This may bring the Tamp Head up abruptly.

Keep fingers clear.

4. Cycle the machine several times (trigger the Product Switch (09)) and

observe the label web tracking. Web tracking should settle to a consistent
line. Once you have determined a consistent line has been achieved, set the
web guides on each side of the web.

NOTE: To ensure the label feeds properly onto the Vacuum Head (04), the Head
(04) must be as close as possible to the edge of the peeler bar (10), without hitting
it.

1. Loosen the two Thumbscrews (05) that hold the Star Wheel Assembly (06).
2. Slide the assembly up until the Star Wheel completely turns over and is down

on a flat side.

3. Next, slide the Star Wheel Assembly (06) up or down until the point of the Star

Wheel (07) catches the lead edge of a label (08).

4. Tighten the Thumbscrews (05).
5. Trigger the Product Switch (09) to dispense a label.
6. It may be necessary to repeat steps 5 several times.
7. It may also be necessary to adjust the air assist blow tube pressure (See Air

Assist Tube on page 9)


NOTE: The position of the label relative to the peeling edge can also be adjusted via
the three-turn dial on the front panel marked “OFF DELAY” if your machine is
equipped with this feature. Release the lock (black tab) and turn clockwise for more
delay.


Fig 17

Advertising