4 operating procedure, 4 operating procedure -11 – Yokogawa EJX115A User Manual

Page 58

Advertising
background image

<4. Diagnostics>

4-11

IM 01C25T01-06EN

4.2.2.4 Operating Procedure

The basic flow of the ILBD operation is as follows.

1) Initial setting

2) Condition check

3) Start up

4) Perform the ILBD algorithm.

If an alarm is often generated or the process

condition changed in the ILBD operation, do

tuning to change the alarm setting, or to reset the

reference values.
Fill out the information to the checklist, at the

process shown in below figure.

(Refer to the Appendix 1. ILBD Check List)

F0407.ai

NG

1, 2

7

3

4

5, 6

10

1-1) Alert Setting

• Enable an alert to be generated by

Diag Out Option parameter.

1-2) Alarm Masking

• Select the alarm status to display on

LCD or to give an alert by

Diag

Option parameter.

2-1) Check Stability of pressure

• Check the stability of Pres value.

2-2) Check Fluctuation Values

• Check whether the fluctuation values

are available for ILBD.

3-1) Obtain Reference Values

• Obtain a reference fluctuation value of

differential pressure/pressure and

static pressure under normal condition.

3-2)

Check Detection

Capability

• Simulate the blockage detection

operation with a three-valve

manifold or stop valve.

Tuning

• Change the threshold value by

Limit parameter.

• Change the sampling time by

Diag Period parameter.

Reset Reference Values

• Reset a reference fluctuation

value of differential

pressure/pressure according to

process condition.

4) Perform ILBD algorithm

Refer to subsection 4.2.2.11

Refer to

subsection 4.2.2.10

Process condition is

changed by a

comparison of the

condition when the

reference values were

obtained.

Blockage Detection

Alarm is generated.

Refer to

subsection 4.2.2.9

Spurious alarm detection.

Refer to subsection 4.2.2.8

Refer to subsection 4.2.2.7

Refer to subsection 4.2.2.6

Refer to subsection 4.2.2.6

Refer to subsection 4.2.2.5

Refer to subsection 4.2.2.5

1) Initial Setting

2) Condition

Check

3) Start up

Items on

Check sheet

OK

Figure 4.5

Flow Chart of ILBD Operation

Advertising