. After a path status is changed to online, the path can be selected as a

useable path by HDLM in the same manner as automatic path switching.

When using the Thunder 9500V series, or Hitachi AMS/WMS series, HDLM

selects the path to use from online owner paths, and then from online non-

owner paths. When the Lightning 9900 series, Lightning 9900V series, Hitachi

USP, Universal Storage Platform V/VM, Virtual Storage Platform, Hitachi

AMS2000 series, or Hitachi SMS is being used, since all the paths are owner

paths, the path to use is not switched even if you change the path status to

online by using the Path Management window or the online operation.

For details on how to change the path status in the Path Management

window, see the HDLM GUI Help.

Path Status Transition

This subsection explains the online and offline path statuses described in

Performing Failovers and Failbacks Using Path Switching on page 2-16

. There

are four types of online statuses, and three types of offline statuses. Each

type is described below. In the descriptions, an offline operation refers to

performing an offline operation by using the Path Management window in the

HDLM GUI, or by executing the dlnkmgr command's offline operation. For

details on the offline operation, see

offline (Places Paths Offline) on page

6-6

.

The Online Path Statuses

The online path statuses are as follows:

Online
I/Os can be issued normally.

Online(P)
A state in which a path in the Online status is in the waiting-to-execute

status to be taken offline.
This status occurs in a cluster configuration only.
The Online(P) status indicates that the user has requested an Online

path to be taken offline, for a path that is connected to an LU that is

currently performing reserve processing. I/O operations can still be issued

normally until the reserve processing on the LU finishes. After the reserve

processing finishes, the offline operation request will be performed and

the path status will become Offline(C).
The (P) means pending, which indicates that the operation to take the

path offline is in the waiting-to-execute status (i.e. a request has been

made).

Online(E)
An error has occurred on the path, but none of the other paths that

access the same LU are in the Online status.
If none of the paths accessing a particular LU are in the Online status,

one of the paths is changed to the Online(E) status. This ensures that

the LU can be accessed through at least one path.