3 preparing hardware for migration, Verifying hardware and operating system support – HP Insight Foundation Software for ProLiant User Manual

Page 17

Advertising
background image

3 Preparing hardware for migration

Verifying hardware and operating system support

Before you start any X2P (P2P or V2P) migration, verify the following:

•

The source server operating system is supported on the destination server. To verify OS support
on ProLiant destination servers, see the following website:

http://www.hp.com/go/ossupport

•

For the supported hardware and software configurations of server migration, see HP Insight
Management Support Matrix
available at:

Enterprise Information Library

Remove unsupported storage and NIC controllers from the destination server before you perform
a migration. Unsupported storage and NIC controllers can be added back on the destination
server, with proper manual configuration, after a migration.

Verifying system requirements for the application station

The application station has the following prerequisites:

•

A supported Windows operating system running on physical hardware or as a Windows
guest on a supported hypervisor. For a list of supported operating systems, and CMS hardware
and software requirements and caveats, see HP Insight Management Support Matrix at the
following website:

Enterprise Information Library

•

Microsoft iSCSI Initiator, which you can download and install from

http://www.microsoft.com

if it is not already available with the operating system on your application station.

•

Insight Control server migration installed on an NTFS partition.

•

Availability of ports 51124 and 51125 (or ports specified during Insight Control installation
for agent communications and HP Integrated Lights-Out (iLO) booting).

•

Availability of port 51127.

•

User account credentials with administrative rights.

•

Free disk space of at least 600 MB per iLO boot, while booting a destination server for P2P
and V2P.

•

The initial installation of Insight Control server migration can take 1 GB of storage space, and
each automatically booted destination server will need at least 600 MB of storage space on
the application station .

NOTE:

Before running migration of Windows 2008 SP2 to Smart Array controllers, delete the

following files located in the IC Server Migration Installation base>\log folder:

dismlogs.txt.pkgmgr

dismlogs.txt.pkgmgr.dpx

dismlogs.txt.pkgmgr.perf

Verifying hardware and operating system support

17

Advertising
This manual is related to the following products: