Installing the vls9000 interswitch link kit – HP 9000 Virtual Library System User Manual

Page 41

Advertising
background image

NOTE:

Fibre Channel switch #1 is on the bottom and switch #2 is on the top. If present, Fibre

Channel switch #3 is on the bottom and switch #4 is on the top.

1.

Connect the Fibre Channel switches to the nodes, base array enclosures, and Ethernet switches
if not already connected using

Table 10 (page 40)

and

Table 11 (page 40)

.

2.

If you are installing more than one array:
a.

Connect a Fibre Channel cable from Fibre Channel switch #1 to port 0 of each additional
RAID controller 1 (array 1, array 2, etc.) Use the switch #1 ports in this order: 19, 8,
18, 7, 17, 6, 16.

b.

Connect a Fibre Channel cable from Fibre Channel switch #2 to port 0 of each additional
RAID controller 2 (array 1, array 2, etc.). Use the switch #2 ports in this order: 19, 8,
18, 7, 17, 6, 16.

3.

If installing a second connectivity kit in rack 4:
a.

Connect a Fibre Channel cable from Fibre Channel switch #3 to port 0 of each additional
RAID controller 1 (array 13, array 14, etc.) Use the switch #3 ports in this order: 9, 19,
8, 18.

b.

Connect a Fibre Channel cable from Fibre Channel switch #4 to port 0 of each additional
RAID controller 2 (array 13, array 14, etc.). Use the switch #4 ports in this order: 9, 19,
8, 18.

4.

Secure together the Fibre Channel cables installed in this procedure and the Ethernet cables
installed previously with Velcro® ties. Route them to the right side of the rack.

Installing the VLS9000 Interswitch Link Kit

The following sections describe the procedures for configuring the Ethernet switches and installing
the interswitch link kit.

Installing the VLS9000 Interswitch Link Kit

41

Advertising
This manual is related to the following products: