Assembly over drawer, figure 2a, Worktop: must have a minimum thickness of 20 mm, Assembly over oven, figure 2b – Siemens EH679MB17E User Manual
Page 5: Hob: must have a minimum thickness of 30 mm, Note, Installation above the dishwasher, Ventilation, figure 4, Ventilating the hob requires, Installing the appliance, figures 5/6, Installation of fastening guides, (figure 5)
                                    Advertising
                                    
                                        
                                    
                                
                                 Assembly over drawer, figure 2a, Worktop: must have a minimum thickness of 20 mm, Assembly over oven, figure 2b | Hob: must have a minimum thickness of 30 mm, Note, Installation above the dishwasher, Ventilation, figure 4, Ventilating the hob requires, Installing the appliance, figures 5/6, Installation of fastening guides, (figure 5) | Siemens EH679MB17E User Manual | Page 5 / 14
                                            Assembly over drawer, figure 2a, Worktop: must have a minimum thickness of 20 mm, Assembly over oven, figure 2b | Hob: must have a minimum thickness of 30 mm, Note, Installation above the dishwasher, Ventilation, figure 4, Ventilating the hob requires, Installing the appliance, figures 5/6, Installation of fastening guides, (figure 5) | Siemens EH679MB17E User Manual | Page 5 / 14
                                                                            
                                    Advertising
                    
                        
                    
                            
                            
                    This manual is related to the following products: