SECTION 4 - MACHINE OPERATION

4-14

– JLG Lift –

3121644

4.13

MACHINE LIFTING AND TIE DOWN

See Figure 4-4.

Lifting

1. Refer to the Serial Number Plate, refer to the Specifica-

tions section of this manual, or weigh the individual unit
to find out the Gross Vehicle Weight.

2.

Place the boom in the stowed position.

3.

Remove all loose items from the machine.

4. Attach lifting device and equipment only to the desig-

nated lifting points.

5.

Properly adjust the rigging to prevent damage to the
machine and so the machine remains level.

Tie Down

1.

Place the boom in the stowed position.

2.

Remove all loose items from the machine.

3.

Secure the chassis and the platform using straps or chains of
adequate strength.

Advertising