Tie down, 14 stowing the jib for transport, Tie down -15 – JLG 1200SJP Operator Manual User Manual

Page 75: 14 stowing the jib for transport -15

Advertising
background image

SECTION 4 - MACHINE OPERATION

3121141

– JLG Lift –

4-15

Tie Down

WHEN TRANSPORTING THE MACHINE, THE BOOM MUST BE FULLY LOWERED INTO
THE BOOM REST.

NOTE:

Prior to loading the machine onto a trailer, it will be necessary to
rotate the turntable 180 degrees to provide better weight distri-
bution.

1.

Place the boom in the stowed position with the turntable
locked.

2.

Remove all loose items from the machine.

3.

Secure the chassis and the platform using straps or chains of
adequate strength and attached to the designated tie down
points.

4.14

STOWING THE JIB FOR TRANSPORT

1.

Place the boom in the stowed position with the axles
retracted.

2.

Hold the Jib Swing control switch to the right until the plat-
form will no longer swing.

NOTE:

The Jib Swing function is not operable when the Capacity Select
control is in the 1000 lb. (
454 kg for ANSI markets and 450 kg
for CE and Australia markets) position.

NOTE:

Automatic platform leveling is disabled when stowing the jib.

3.

Push and hold the Jib Stow control switch until the jib and
platform are in the stowed position under the boom.

Advertising
This manual is related to the following products: