Section 3 - operation, 1 warm-up and operational checks, 1 warm-up and operational checks -1 – JLG 4017 Platform Operator Manual User Manual

Page 33

Advertising
background image

Section 3 - Operation

3-1

31200029

SECTION 3 - OPERATION

3.1

WARM-UP AND OPERATIONAL CHECKS

This section outlines the checks to be performed at the beginning of each work shift
or at each change of operator.

Warm-up and operational checks of the telehandler are to be completed before
entering the platform. Refer to the Operator & Safety Manual supplied with
telehandler.

After start-up from platform and engine warms, check:

1. Horn must be audible with engine running.

2. All boom and platform functions - operate smoothly and correctly.

3. Perform any additional checks described in Section 7.

Advertising
This manual is related to the following products: