Assembly, Assembly -11, Routing installation of retract wire ropes -11 – JLG 660SJ Service Manual User Manual

Page 183

Advertising
background image

SECTION 4 - BOOM & PLATFORM

3121202

– JLG Lift –

4-11

Assembly

NOTE: When installing fly section wear pads, install same

number and thickness of shims as were removed
during disassembly.

1. Measure inside dimensions of the base and mid

sections to determine the number of shims required
for proper lift.

2. Measure inside dimensions of the mid section to

determine the number of shims required for proper
lift.

3. Install side, top and bottom wear pads to the aft end

of fly section; shim evenly to the measurements of
the inside of mid section.

4. Install retract wire ropes into aft end of fly section,

route wire ropes thru holes in side of fly boom sec-
tion and pull into slot.

5. Install side, top and bottom wear pads to the aft end

of mid section; shim evenly to the measurements of
the inside of mid section.

WHEN ASSEMBLING BOOM SECTIONS, ENSURE THAT THE BOOM
SLIDING TRAJECTORIES HAVE BEEN CLEARED OF CHAINS,
TOOLS, AND OTHER OBSTRUCTIONS.

6. Shim the insides of the boom sections for a total of

1/16 inch (0.062) clearance (if the action is centered,
there will be 1/32 clearance on each side).

Figure 4-14. Routing Installation of Retract Wire Ropes

Advertising
This manual is related to the following products: