Overview of procedure, Check for these obvious conditions first, Battery voltage 24 volts. (fully charge batteries) – JLG 20VP (3120728) Service Manual User Manual

Page 95: Battery connections clean and tight, Key switch positioned to ground (grnd) control, Emergency stop switch set to the reset position), 5 amp fuses on power and pump circuits, ok, Hydraulic oil level, ok

Advertising
Overview of procedure, Check for these obvious conditions first, Battery voltage 24 volts. (fully charge batteries) | Battery connections clean and tight, Key switch positioned to ground (grnd) control, Emergency stop switch set to the reset position), 5 amp fuses on power and pump circuits, ok, Hydraulic oil level, ok | JLG 20VP (3120728) Service Manual User Manual | Page 95 / 104 Overview of procedure, Check for these obvious conditions first, Battery voltage 24 volts. (fully charge batteries) | Battery connections clean and tight, Key switch positioned to ground (grnd) control, Emergency stop switch set to the reset position), 5 amp fuses on power and pump circuits, ok, Hydraulic oil level, ok | JLG 20VP (3120728) Service Manual User Manual | Page 95 / 104
Advertising
This manual is related to the following products: