Personnel Work Platform - Fork Mounted

Use Appropriate Carriage Attachment Capacity Chart

To determine maximum capacity, refer to “Telehandler/
Attachment/Fork Capacity”
on page 5-4.

The operator and personnel in platform must read and understand the
separate personnel work platform manual prior to installing and using a
platform.

The joystick (1) controls lift/lower and extend/retract movement of the boom.

The tilt roller switch (3) controls platform tilt.

• Press roller switch down to tilt up.

• Press roller switch up to tilt down.

Installation Procedure:

• Ensure carriage is properly installed. Refer to “Attachment Installation” on

page 5-9.

• Secure the fork mounted platform to the forks by sliding the fork mounted

platform onto the parent forks and install the retaining pin behind the vertical
shank of the fork.

OY1610