9 inverter, 10 machine function speeds, 11 shut down and park – JLG M400 Operator Manual User Manual

Page 58

Advertising
background image

SECTION 4 - MACHINE OPERATION

4-12

– JLG Lift –

3121215

mum level. The charging cycle will include finishing phase
similar to conventional chargers.

4.9 INVERTER

The inverter converts 48 VDC to 110 VAC to allow operation
of power tools from the machine’s batteries.

• The inverter is operational when the emergency stop

switch is pulled out.

• The machine and inverter can be operated at the same

time.

• The inverter will shut off at approximately 42 VDC and stay

off until the emergency stop switch is recycled. It will oper-
ate again until voltage drops to 42 VDC.

• The machine will operate down to 36 VDC.
• The inverter will shut down if the high temperature light

indicated overheating. It will automatically turn back on
when cooled.

• The overload light indicates an output wiring short circuit

or a load that is too large for the rating of the inverter.

4.10 MACHINE FUNCTION SPEEDS

The Function Speed Control affects the speed of boom func-
tions Lower Lift, Telescope, and Rotate. Turn the control CW
to increase function speed or CCW to decrease function
speed. When in the CCW maximum position, Drive is placed
in creep speed.

4.11 SHUT DOWN AND PARK

NOTE: When parking battery powered units overnight, batteries

should be charged in accordance with instructions in
Section 2 to ensure readiness for following workday.

NOTE: Electric machines are equipped with a static strap due to

static electricity build-ups. Strap is located under rear of
machine chassis.

To shut down and park the machine, the procedures are as
follows:

1. Drive machine to a reasonably well protected area.

2. Ensure boom is lowered over rear drive axle.

3. Shut down Emergency Stop at Platform Controls.

Advertising
This manual is related to the following products: