4 platform installation, 4 platform installation -3, Warning – JLG 4017PS Platforms Operator Manual User Manual

Page 43

Advertising
background image

Section 5 - Platform

5-3

31200345

5.4

PLATFORM INSTALLATION

Verify the platform is properly installed. Refer to the Operation & Safety Manual
supplied with telehandler for complete installation instructions.

Hydraulic Quick Attach - Attachment pin (2) engaged in platform pin recess (1)

and lock pin (3) fully engaged.
Mechanical Quick Attach - Attachment pin (2) engaged in platform pin recess
(1) and lock pin (3) fully inserted and secured with retainer pin (4).

• Platform hydraulic hoses (5) securely connected at boom.

• Platform electric cable (6) securely connected at boom.

WARNING

FALL/CRUSH HAZARD. Always be certain that platform is properly positioned
on boom and secured. Failure to ensure proper installation could permit platform
to disengage.

WARNING

Never use platform without the hydraulic hoses and electrical cable properly
installed.

OZ2802

3

2

1

3

4

5

6

5

6

MECHANICAL

QUICK ATTACH

HYDRAULIC

QUICK ATTACH

3513PS & 4013PS

4017PS BEFORE S/N 1160006867

4014PS

4017PS S/N 1160006867

&AFTER

Advertising