Installing a new link, Installing a new link -30 – JLG M400 Service Manual Service Manual User Manual

Page 146

Advertising
background image

SECTION 4 - BOOM & PLATFORM

4-30

– JLG Lift –

3121827

7. Remove the link from the other section of the pow-

ertrack using a screwdriver.

Installing a New Link

1. Squeeze the peanut cut out end of the new link into

the half-shear (female) end of the track section.

Advertising
This manual is related to the following products: