Replacing fixed end brackets, Replacing fixed end brackets -35 – JLG M400 Service Manual Service Manual User Manual
Page 151
Advertising

SECTION 4 - BOOM & PLATFORM
3121827
– JLG Lift –
4-35
10. Install a new 8-32 x 0.500 self threading screw on
the other side.
NOTE: When tightening screws make sure screw head is
seated against link with no space in between the link
and underside of screw head. Maximum tightening
torque is 18-20 in-lbs.
Replacing Fixed End Brackets
1. Remove the rivets the same way as shown under the
link removal instructions.
MOVE THE CABLES/HOSES OUT OF THE WAY DURING THE
GRINDING PROCESS TO PROTECT THEM. KEEP THE HOSES AND
CABLES COVERED TO PREVENT ANY DEBRIS FROM GETTING ON
THEM.
Advertising
This manual is related to the following products: