2 boom system - two section boom, 1 boom system description, 3 boom assembly maintenance – JLG G6-23A Service Manual User Manual

Page 25: Boom system - two section boom, Boom assembly maintenance, Boom system description

Advertising
background image

3.3

G5-19A, G6-23A

Boom

3.2

BOOM SYSTEM - TWO SECTION
BOOM

3.2.1

Boom System Description

The boom operates via an interchange among the
electrical, hydraulic and mechanical systems. Components
involved include the joystick, tilt cylinder, extend/retract
cylinder, lift/lower cylinder, compensating cylinder,
electronic sensors, various pivots, supporting hardware
and other components.

3.3

BOOM ASSEMBLY MAINTENANCE

The boom assembly consists of the first and second
section booms and supporting hardware.

IMPORTANT: Boom replacement must be completed in
sequence, one boom section at a time, as described in
these instructions.

IMPORTANT: Before removing the boom, the carriage
or any other attachment must be removed from the quick
attach.

Before beginning, conduct a visual inspection of the
machine and work area, and review the task about to be
undertaken. Read, understand and follow these
instructions.

During service of the boom, perform the following:

1. Check wear pads. (Refer to Section 3.4.1, “Wear

Pad Inspection.”)

2. Apply grease at all lubrication points (grease fittings).

(Refer to Section 2.6, “Lubrication Schedules.”)

3. Check for proper operation by operating all boom

functions through their full ranges of motion several
times.

Advertising
This manual is related to the following products: