9 condition tab, Ow (see – INFICON IQM-233 Thin Film Deposition Controller PCI-Express Card Codeposition Software Operating Manual User Manual

Page 54

Advertising
background image

2 - 34

IP

N 07

4-

58

5-

P1

A

IQS-233 Operating Manual

2.3.3.5.9 Condition Tab

Preconditioning and postconditioning phases are configured in the Condition tab.
See

Figure 2-30

.

Figure 2-30 Film Edit window - Condition tab

Pre Condition pane

Before the deposition phase starts, it is often necessary to precondition the source
material, especially when using a thermal source. At the end of the precondition
phase, the power level should be at or near the power required for deposition.

Ramp 1 Power (%) . . . . . . . 0.00 to 100.00%

The output Power at the end of the Ramp 1 Time
phase. This value is a percentage of the full scale
output (Full Scale Out) selected in the Outputs tab of
the System Setup window.

Ramp 1 Time (sec) . . . . . . . 0.00 to 30000 s

The length of time to change the output power from
the initial power level to the Ramp 1 Power level.

Soak 1 Time (sec) . . . . . . . . 0.00 to 30000 s

The length of time the output Power remains at the
Ramp Power level.

Ramp 2 Power (%) . . . . . . . 0.00 to 100.00%

Same command as Ramp 1 Power. Typically, the
Ramp 2 Power value is set to approximately the
power level required to achieve the desired initial
deposition rate.

Advertising