Decrease the pressure, Increase the accumulator precharge pressure – MTS Series 505G2 SilentFlo Hydraulic Power Unit Model 505G2-180 User Manual

Page 46

Advertising
background image

Description

Item

Nitrogen Bottle

14

Nitrogen Bottle Valve

15

Regulator Output Pressure Valve

16

Regulator Shut-Off Valve

17

Nitrogen Bottle Pressure Gage

18

Regulator Output Pressure Gage

19

Nitrogen Supply Hose

20

Extension Hose

21

Close

22

Bleed Valve

23

Open

24

Input Check Valve

25

High Pressure Gage 0–21 MPa (0–3000 psi)

26

Decrease the Pressure

1. Slowly open the bleed valve on the charging kit until gas begins to escape. When the pressure reading

on the appropriate pressure gage drops to the level required, close the bleed valve.

2. Close the locknut. Open the bleed valve on the accumulator charging kit and remove the chuck valve from

the accumulator.

3. Install the valve stem cap and protective cover.

Increase the Accumulator Precharge Pressure

1. Close the locknut on the accumulator.

2. Open the bleed valve two turns.

46 Series 505G2 SilentFlo™ Hydraulic Power Unit Product Information

Installation

Advertising