Secureconnect unit checklist – Rockwell Automation 2100 CENTERLINE Low Voltage Motor Control Centers  User Manual

Page 84

Advertising
background image

84

Rockwell Automation Publication 2100-IN012E-EN-P - February 2012

Chapter 7 Final Checklist Before Energizing

SecureConnect Unit
Checklist

Verify these items before using a SecureConnect unit.

1.

Make sure the stab lockout is pushed in.

2.

Verify the disconnect handle is OFF/O.

3.

Insert the tool in the shaft port and rotate the tool to the right.

The status indicator should change from green to red.

Stab Lockout

Status Port

Shaft
Port

Status
Indicator

ATTENTION: SecureConnect units are shipped inside the unit location
with stabs in the disconnected position. Prior to powering your horizontal
bus, you will need to place all SecureConnect units in the connected
position.

Advertising