Install additional magnet tracks – Rockwell Automation LDC Iron Core Linear Servo Motors User Manual

Page 26

Advertising
background image

26

Rockwell Automation Publication LDC-UM001B-EN-P - March 2011

Chapter 3 Install the LDC-Series Linear Motor

8.

On the opposite end of the base, install the first magnet track using
M5 x 0.8 x 16 mm Socket Head Captive Screw (SHCS).

Do not tighten screws.

9.

Install additional magnet tracks.

Place each magnet track on the base and slide towards the previously install
magnet track. For correct magnetic polarity the alignment holes should all
be on the same side.

IMPORTANT

Use non-magnetic tools and hardware such as beryllium copper,
300 series stainless steel. If not available proceed with care
since ferrous items will be attracted to the magnet tracks.

3

2

Alignment Holes

Advertising