Assign meter tags to opc, Device – Rockwell Automation Energy Management Accelerator Toolkit Quick Start User Manual

Page 151

Advertising
background image

Rockwell Automation Publication IASIMP-QS016C-EN-P - October 2014

151

FactoryTalk EnergyMetrix Software Meter and Tag Setup Chapter 7

11.

Confirm the meter was created in the correct
group.

For the

Efficient Industries Plant 1

example,

the electric meter listing should look like this.

Assign Meter Tags to OPC Device

You will now assign meter tags to an OPC server.

For the

Efficient Industries Plant 1

example, you will assign only the Real Energy Net meter tag to the Data Center (OPC

Server) for logging consumption.

1.

Select the meter.

For this example, select Data Center (OPC Server).

2.

Click the Meter Setup tab.

3.

Click the Add a new meter tag link.

Advertising