Junction box – Chamberlain LA412 User Manual

Page 25

Advertising
background image

6

JUNCTION BOX
The following items are required to complete the junction box installation:
• 4 x 4 Junction Box with 3/4" NPT threaded port holes
• Screws
• PVC Conduit

Open the junction box by removing screws (4) and set aside.
Mount the junction box within 5' of second operator.

Junction Box
Cover

Junction Box

Mov

ing

Gate Can

Ca

use

Inju

ry o

r Death

KEE

P CL

EAR!

Gate

may

mo

ve a

t any

tim

e wit

hout

pri

or w

arn

ing.

Do

not

let c

hild

ren

ope

rate

the

gat

e o

r

play

in the

gat

e ar

ea.

This

entr

ance

is f

or vehic

les o

nly

Pedest

rians

mu

st use

sepa

rate

ent

ran

ce

Control Box

Gate Operator (Gate 1)

Gate Operator (Gate 2)

Extension Cable

Within 5’

Within 5' PVC conduit

(not provided) to protect

the power cable for solar

panel and low voltage

wire from lawn mowers

and string trimmers.

25

Wiring

Junction Box

Solar Panel

(facing South)

Screws (4)

Advertising
This manual is related to the following products: