Measurement preparation, 1) connecting the adapter (tube) to the main unit, 2) connecting the attachment (pipette side) – A&D Weighing AD-1690 User Manual

Page 9

Advertising
Measurement preparation, 1) connecting the adapter (tube) to the main unit, 2) connecting the attachment (pipette side) | A&D Weighing AD-1690 User Manual | Page 9 / 25 Measurement preparation, 1) connecting the adapter (tube) to the main unit, 2) connecting the attachment (pipette side) | A&D Weighing AD-1690 User Manual | Page 9 / 25
Advertising