Installing hardware options, Installing the server into the rack, 38 installing the server into the rack – HP DL385 User Manual

Page 38

Advertising
background image

Server setup 38

Installing hardware options

Install any hardware options before initializing the server. For options installation information, refer to the

option documentation. For server-specific information, refer to "Hardware options installation (on page

42

)."

Installing the server into the rack

20.41 - 27.22 kg
47.18 - 60.0 lb

WARNING: To reduce the risk of personal injury or damage to the equipment:

Observe local occupation health and safety requirements and guidelines for

manual handling.

Obtain adequate assistance to lift and stabilize the chassis during installation or

removal.

The server is unstable when not fastened to the rails.

When mounting the server in a rack, remove the power supplies and any other

removable module to reduce the overall weight of the product.

CAUTION: Always plan the rack installation so that the heaviest item is on the bottom of the rack. Install

the heaviest item first, and continue to populate the rack from the bottom to the top.

1.

Install the server into the rack. Refer to the installation instructions that ship with the 2U Quick Deploy

Rail System for more information.

2.

Install the cable management arm into the rack.

NOTE: If the cable management arm is mounted on the right side of the rack, you will have to remove it

when adding or replacing a redundant hot-plug power supply.

3.

Connect peripheral devices to the server.

WARNING: To reduce the risk of electric shock, fire, or damage to the equipment, do not

plug telephone or telecommunications connectors into RJ-45 connectors.

Advertising