Handle installation – HONDA EM3800SX User Manual

Page 59

Advertising
background image

57

Handle Installation

TORQUE:

RIGHT HANDLE
BRACKET

LEFT HANDLE BRACKET

8

16 mm FLANGE BOLT (4)

LEFT UPPER HANDLE ASSY

RIGHT UPPER HANDLE ASSY

Install the right and left handles on the generator upper frame using
the brackets and 4 flange bolts.

17

22 lbf·ft (24

29 N·m , 2.4

3.0 kgf·m)

03/11/17 18:47:48 31Z21600_058

Advertising
This manual is related to the following products: