HP BL685C User Manual

Page 36

Advertising
background image

Hardware options installation 36

4.

Remove the mezzanine connector cover. Retain the cover for future use.

5.

Install the mezzanine card. Press down above the connector to seat the board.

6.

Install the access panel (on page

16

).

7.

Install the server blade ("

Installing a server blade

" on page

19

).

8.

Power up the server blade (on page

14

).

HP Smart Array E200i Controller battery pack
option

The optional BBWC enabler provides the system with a means for storing and saving data in the event of

an unexpected system shutdown.

Advertising
This manual is related to the following products: