Installation manual for outdoor unit, 5) purging method ( the refrigerant is r407c) – haier Duct Type Air Conditioning No. 0010572410 User Manual

Page 15

Advertising
background image

14

INSTALLATION MANUAL FOR OUTDOOR UNIT

7

90 for 6 sec.

4

(5) Purging method ( the refrigerant is R407C)

If it does not stop gas leakage, discharge

whole refrigerants from the serice port.

After flaring work again and vacuumize,

fill up prescribed refrigerant from the gas

cylinder.

Detach the charge hose from the service port, open

3-way valve and 3-way. Turn the valve rod

anticlockwise until hitting lightly.

6

In case of gas leakage, tighten

parts of pipe connection. If

leakage stops, then proceed

steps.

6

No gas leakage?

5

4

Open the valve rod for the 3-way valve to and angle of

anticlockwise 90 degree.

After 6 seconds later, close the 3-way valve and male

the inspection of gas leakage.

3

Vacuumize for over 15min. And check the level gauge

which should read -0.1 MPa (-76 cm Hg) at low

pressure side. After the completion of vacuumizing,

close the handle 'Lo' in gaugemanifold and stop the

operation of the vacuum pump.

Check the condition of the scale and hold it for 1-2min.

If the scale-moves back in spite of tightening, make

flaring work again, the return to the beginning of 3 .

2

Open the handle at low in gaugemanifold, operate

vacuum pump. If the scale-moves of gause (low)

reach vacuum condition in a moment, check 1 again.

1

Detach the service port's cap of 3-way valve, the

valve rod's cap for 3-way valve and 3-way's, connect

the service port into the projection of charge hose

(low) for gaugemanifold. Then connect the projection

of charge hose (center) for gaugemanifold into

vacuum pump.

To use vacuum pump

3

Close

CAUTION:

If the refrigerant of the air conditioner leaks, it is necessary to make

all the refrigerant out, then charge the liquid refrigerant into air

conditioner according to the amount marked on the name plate.

7

8

After attaching the each caps, check the gas leakage
around the caps.

To prevent the gas leakage, turn the service port's

cap, the valve rod'd cap for 3-way valve and 3-way's

a lottle more than the point where the torque increases

suddenly.

2

Open

Service port cap

7

3-way valve

3-way valve

Valve rod cap

Valve rod cap

7

Liquid pipe

Gas pipe

Gaugemanifold

Vacuum pump

3-way valve

3-way valve

6.35mm(1/4'')

12.7mm(1/2'')

Service port

90

90

3-way valve

3-way valve

3-way valve

3-way valve

6

6

Advertising