Installing regulator tower – Hearth and Home Technologies RCTS-MLT Remote Control Kits 6000C-LP User Manual

Page 3

Advertising
background image

3

Hearth & Home Technologies • RCTS-MLT Instructions • 100-920 Rev. D • 10/10

Figure 4. Plunger insertion

NOTE: All steps required for installation of the fl ame controller
MUST be done by a qualifi ed gas service technician.

FLAME CONTROL

SOLENOID

REGULATOR

TOWER

PLUNGER

JAM NUT

REMOTE

RECEIVER

Line cord
from fan

LEARN

110/120 VAC, 3A

(Receptacle on back)

Alternative Wiring for units with a wall switch

Disconnect the wall switch wire from the TH terminal on
the valve and connect this wire to male connector supplied
on the receiver. Connect remaining female connector from
receiver to the TH terminal on the valve.

Adding Optional Fan/Blower

Plug 2-prong fan cord directly into the 3 prong polarized
plug on the back of the receiver (see Figure 3). This
receptacle output is 110/120 VAC, 3 AMP.

Figure 3. Adding Fan/Blower

Installing Regulator Tower

NOTE: A manometer MUST be used to set the manifold
pressure on the gas valve.

1. Using a Torx T20, or slotted screwdriver, remove and

discard the three pressure regulator mounting screws
(A), pressure regulator tower (B), and the spring and
diaphragm assembly (C) See Figure 5.

2. Ensure the rubber gasket (D), which is pre-fi tted as

part of assembly (E), is properly positioned and install
the new pressure regulator tower using the supplied
screws (F). Tighten screws securely (Reference torque
= 25 lb-in.) and remove cover screw (G).

3. Insert the correct plunger into the fl ame control

solenoid (BLUE = NATURAL GAS, RED = PROPANE).
See Figure 4.

A

F

G

B

C

D

E

Figure 5. Installing Regulator Tower

Advertising