Installation, 1 equipment lists, 2 tools & materials – Furuno GP-330B User Manual

Page 7: 1 equipment lists 1.2 tools & materials

Advertising
background image

1

1. INSTALLATION

1.1 Equipment Lists

1.2 Tools & Materials

• Mounting hardware with standard 1-14" UNS (Pole/Rail Mount installation)

threads

• Safety goggles
• Dust mask
• Screwdrivers (Pole/Rail Mount or Deck Mount installation)
• Teflon pipe thread tape, 1/2" wide (some installations)
• Pencil (some installations)
• Electric drill (some installations)
• Drill bits (some installations):

• Pilot hole - 3 mm or 1/8"
• Deck mount screw holes - 5.1 mm or #7
• Deck mount cable hole - 25 mm or 1"
• Flush mount stud holes - 6 mm or 1/4"
• Flush mount cable hole - 38 mm or 1-1/2"

• Loctite

®

242

®

or other removable thread locker (Flush Mount installation)

• Cable ties (some installations)

Name

Type

Code No.

Qty

Remarks

Standard Supply

GPS
Receiver

GP-330B

1

Installation
Materials

CP20-03200

000-012-581

1 set

With NMEA
2000 cable (6 m)

See packing
list at back of
manual.

CP20-03210

000-012-582

1 set

No cable

Optional Supply

Cable Assy. 22-1025-02

000-168-883-10

1

6 m, for NMEA 2000

®

Cable Assy. 22-1025-06

000-168-884-10

1

10 m, for NMEA 2000

®

Cable Assy. 22-910-03

000-168-885-10

1

10 m, for NMEA 0183

Cable Assy. MJ-A7SPF/

SRMD-100

000-144-534

1

10 m, straight, MJ7P(P)-
MJ7P(J), for NMEA 0183

Flush Mount
Kit

-

001-037-630

1

Deck Mount
Kit

-

001-037-640

1

Advertising