FRIGIDAIRE Coin- Operated Commercial Tumble Action Washer User Manual

Page 8

Advertising
background image

8

8

(2) Slide Stop

Screws

FIGURE 3

(1) Receiver Block Screw

Spare Parts

Compartment

and Screw

Coin Receiver

Block

FIGURE 4

FIGURE 5

FIGURE 6

NOTE:
Black
colored
slots are
closed off
by block-
out key.

• Pull coin slide out of coin chute (see FIGURE 4).

STEP 4
Turn coin slide upside down and remove screw that holds coin receiver
block (see FIGURE 5).

STEP 5
Remove coin receiver block from coin slide (see FIGURE 6):

• Turn coin slide right side up. Keep coin receiver block in place with
your fingers.

• Carefully lift coin slide from coin receiver block. If necessary, shake
coin slide gently to loosen block.

STEP 3
Remove coin slide from coin chute:
• Unhook and remove the coin slide return spring. (see FIGURE 2).
• Turn coin slide mechanism upside down.
• Remove coin slide stop by taking out two screws to the chute bottom
(see FIGURE 3).

Ratchet

Dog and

Spring

Block-Out

Keys

FIGURE 8

FIGURE 7

VEND
PRICE

COIN SLOTS

1 2 3 4 5 6 7 8

$.10

0

$.20

$.25

$.35

$.45

$.50

$.60

$1.00

$2.00

$1.10

$1.25

$1.35

$1.50

$1.60

$1.75

$1.85

$1.70

$1.45

$1.20

$.95

$.85

$.75

$.70

TABLE OF VEND PRICE

To remove block-out keys, pull straight up.

NOTE: Be sure block-out keys and /or dime inserts are
seated properly and ratchet dog is in place with irs spring
connected (see FIGURE 8).

Be sure the proper coin sizing block is in place.

STEP 6
Set new vend price by adding or removing the appropriate
block-out keys and/or dime inserts according to th Table
of Vend Prices
(see FIGURE 7).

Advertising