Installation instructions, Commissioning – Stovax AR0368 User Manual

Page 14

Advertising
background image

14

INSTALLATION INSTRUCTIONS

COMMISSIONING

1.1

Close all openable doors and windows in the room. Ignite

the stove and operate on maximum for 10 minutes.

Position a lighted smoke match just inside the draught

diverter opening and check that all smoke is drawn into the

opening. In restricted locations a mirror can be used. See

diagram 1. If there is any doubt, run the stove for a further

10 minutes, and repeat the test.

1.2

If there are any extractor fans in adjacent rooms, the test

must be repeated with the fans running on maximum and

interconnecting doors open.
IF SPILLAGE PERSISTS, DISCONNECT THE APPLIANCE

AND SEEK EXPERT ADVICE.
For future reference record the installation details on the

Appliance Commissioning Checklist of these instructions.

1. COMMISSIONING

1

Advertising
This manual is related to the following products: