Without, Installation preparation, Preparation – GE Advantium ZSC2202 User Manual

Page 6: An accessory storage drawer

Advertising
background image

Installation Preparation

6

Preparation

WITHOUT

an Accessory Storage Drawer

PREPARE THE OPENING

(CONT.)

Installation over a GE/Monogram Oven and
Warming Drawer:

NOTE: Additional clearances between the cutouts
may be required. Check to be sure the oven
supports above the Warming Drawer location do
not obstruct the required interior depth and height.
See Warming Drawer installation instructions for
details.

CAUTION: For personal safety, the mounting
surface must be capable of supporting the
cabinet load, in addition to the added weight of
this approximate 80-pound oven, plus additional
oven loads of up to 50 pounds or a total weight
of 130 pounds.

Construct Solid
Bottom Min.
3/8” Plywood
Supported by
2x4 or 2x2
Runners all
Four Sides

30”

23-1/2”

25-1/4”

17-1/2”

2” Min.

Per Oven

Requirement

45-1/4”

Min.

Per warming drawer requirement

2” Min.
(3” recommended)

PREPARE THE OPENING

(CONT.)

Installation over a GE/Monogram Oven:

• If you are replacing a GE/Monogram electric

double oven with the combined installation of
an Advantium 240V and a single oven, use the
dimensions shown. The middle rail separating
the two openings may need to be larger than
the 2” minimum shown.

30”

23-1/2”

25-1/4”

17-1/2”

2” Min.
(3” recommended)

45-1/4”

Min.

Construct Solid
Bottom Min.
3/8” Plywood
Supported by
2x4 or 2x2
Runners all
Four Sides

Per Oven
Requirement

Advertising
This manual is related to the following products: