Assembly – Gravely 992055 25HP PM160Z User Manual

Page 10

Advertising
background image

GB - 10

UNIT ASSEMBLY

Package Contents:

Unit, Mower Deck and Literature Pack

Unpack Unit

Remove unit and all other components from shipping
container.

Open bypass valves (see MOVING THE UNIT

WITH THE ENGINE OFF on page 15). Push unit from
container onto a level surface. Close bypass valves.

Check Tire Pressure

See SPECIFICATIONS on page 28.

Position Steering Levers

Remove bolts and spacers from steering levers. Flip the
steering levers into operating position. Reinstall spacers,
bolts and nuts. Tighten hardware securely. See Figure 3.

Connect Battery

Connect negative (–) battery cable to battery (see Replace
Battery
on page 19 an
d perform steps 2 through 3 in the
installation section).

Check Engine Oil

Refer to Engine Manual.

Check Hydraulic Oil

See HYDRAULIC FLUID on page 17.

Position Deflector - 60-Inch Decks

Remove, reverse, and reinstall discharge chute and
mounting bracket.

Fill Fuel Tank

See FILLING FUEL TANK on page 14.

Hardware

Check for loose hardware.

Check Safety Interlock System

See Safety Interlock System on page 12.

Level Mower Deck

See Leveling the Mower Deck on page 24.

Check Function of All Controls

Ensure unit runs and performs properly.

ASSEMBLY

WARNING: AVOID INJURY. Read and understand
entire Safety section before proceeding.

1. Steering Lever in

Shipping Position

2. Spacers and Hardware

3. Steering Lever in

Operation Position

OF3520

Figure 3

1

2

3

2

WARNING: Discharge chute must pivot freely. DO
NOT over tighten the pivot bolts.

WARNING: Safety interlock system failure and
improper operation of unit can result in death or
serious injury. Test this system each time unit is
operated. If this system does not function as
described, do not operate until repairs are made.

WARNING: FAILURE OF CONTROLS could result
in death or serious injury.

Advertising