Installation, Installation of the warming drawer, Before you begin – GE JTD910SBSS User Manual

Page 11: Tools needed, Custom panel kits, Product dimensions

Advertising
background image

Safety Instructions

Operating Instructions

Care and Cleaning

Installation Instructions

Troubleshooting T

ips

Customer Service

11

Installation of the warming drawer.

Read these instructions completely and carefully.

Before You Begin

IMPORTANT: Save these instructions for the
local electrical inspector’s use.

IMPORTANT: OBSERVE ALL GOVERNING CODES
AND ORDINANCES.

NOTE TO INSTALLER: Leave these instructions
with the appliance after installation is completed.

NOTE TO CONSUMER: Keep this Owner’s
Manual and Installation Instructions for
future use.

NOTE: This appliance must be properly
grounded.

NOTE: Insure that the power cord does not
contact the hot surfaces on the bottom of
ovens, cooktops, or any other appliance.

Tools Needed

2 x4 or 2 x 2 lumber for runners and brace

Wood screws and adhesive or other hardware
for installing runners or shelf to support
warmer drawer.

Runners must be level, rigidly mounted and capable of
supporting 150 pounds.

Saw

Level

Drill and 1/16

bit

Phillips screwdriver

Custom Panel Kits

ZXD27B—This kit provides for the installation of a
custom front panel on 27

wide models.

ZXD30B—This kit provides for the installation of a
custom front panel on 30

wide models.

Product Dimensions

27

23

1

4

9

1

A

10

1

2

26

1

4

Including handle

Dimension A

27

Drawer

30

Drawer

26

3

4

30

Advertising
This manual is related to the following products: