Flooring and leveling 6, Flooring and leveling – GE 164 D2588P120 User Manual

Page 6

Advertising
background image

FLOORING AND LEVELING

Flooring Under the Range

Your range, like so many other household items,

is heavy and can settle into soft floor coverings
such as cushioned vinyl or carpeting.
When moving
the range on this type of flooring, use care, and it is
recommended that these simple and inexpensive
instructions be followed.

The range should be installed on a l/4-inch-thick

sheet of plywood (or similar material) as follows:
When the floor covering ends at the front of the
range,
the area that the range will rest on should be

built up with plywood to the same level or higher than
the floor covering. This will allow the range to be
moved for cleaning or servicing.

Leveling the Range

Use a 1%” open-end or adjustable wrench to equally
back out the four legs. The flanges (rims) below the
sides of the

must be raised above the top of

the countertop. Carefully

the range into its

installation space. Observe that it is clearing the
countertop. Then place a spirit level or a glass
measuring cup partially filled with water on one of the
oven shelves to check for levelness. If using a spirit
level, take two readings, with the level placed
diagonally first in one direction and then the other.

Adjust the four legs carefully. Level the range front to
back and side to side. The range legs must rest on the
floor. The range must not hang from the countertop.

6

Advertising
This manual is related to the following products: