Installation

(cont’d)

A complete information package is furnished with
each transfer switch including a complete connection
diagram and schematic which details all necessary
control circuit field connections.

The engine start control wires connect to the
engine start relay terminals located to the left
of the microprocessor. Figure 6 shows the location
of these terminals.

To CPS Box

To Power

Panel

Input/Output

Connectors

to I/O Modules

Engine Start

Connections

Clock Program
Backup Battery
Remove protective
strip to enable clock
functions

Network Connector

Control Connections

The terminals are clearly identified by a label on the
microcontroller backplate. In the case of manual trans-
fer switches, or in other applications not requiring the
microprocessor, clearly marked terminal blocks are
provided in the upper left corner of the control panel
for the engine start control wires.

Figure 6

DANGER

HAZARDOUS VOLTAGE

(Can Cause Severe Injury or Death)

Turn OFF all power before installation, adjustment, or removal of transfer switch or any of its components.

Advertising
This manual is related to the following products: