Through-the-wall, Through-the-wall installation – GE 23-11-2129N-002 User Manual

Page 13

Advertising
background image

Customer Service

Troubleshooting T

ips

Operating Instructions

Safety Instructions

Installation Instructions

Through-the-Wall Installation

The case may be installed through-the-wall in both existing and new construction.

Read completely, then follow step-by-step.

IMPORTANT:

Any side louvers must project on the outdoor side of the wall.

The room side of the case must project into the room at least 1

1

/

2

from the finished wall.

The case must be installed level from side-to-side and with a 1/ 4

tilt from front to rear.

Remove the air conditioner from the case.

For specific instructions, refer to the Window
Installation Instructions.

Make certain a wall receptacle is available close

to the hole location or make arrangements to

install a receptacle.
Determine the size of wall opening by adding

1/8

to the height and width of the case.

Measure height from the top of the case to the

bottom of the rail.
Place the case in the wall opening and secure

the bottom rail, case sides and top with 12

1

long #10 wood screws.

NOTE: Drill pilot holes, if necessary, for proper
installation. If the frame is oversized, use shims to
prevent case distortion.

D

C

B

A

1

Finish the Wall Opening

Caulk all four sides on the outdoor side of the case to prevent moisture from getting through to the

interior wall. Use of flashing (drip rail) will further prevent water from dripping inside the wall and down

the outside of the building.

2

Plaster line

Trim molding (if desired)

Flashing (drip rail)

Grounding/anti-theft screw

Caulking (between bottom
rail and flashing)

Holes for

#10 1

long

wood

screws

Caulking

Brick veneer

Lintel angle
(if required)

Caulking

1

1

/

2

min.

Roomside

13

Advertising