Ab c b&c d, Ef g h – GE JVB65 User Manual

Page 6

Advertising
background image

30

COOKTOPS/DOWNDRAFT UNITS

JVB34, JVB35, JVB93

Figure 2

Overall Cutout Dimensions















,















Figure 3

Cutout for Vent



















Figure 1

Overall Cooktop Dimensions

1

2

3

NOTE: AGAINST-THE-WALL INSTALLATIONS ARE LIMITED DUE TO DIMENSION REQUIREMENTS.
REFER TO DETAILS BELOW.

PLANNING INSTALLATION (Note: 26

deep cabinets required)

PREPARING CUTOUT

A

B

C

B&C

D

I

E

F

G

H

(Figure 1) (Figure 1) (Figure 1)

(Figure 1)

(Figure 3*)

(Figure 2)

(Figure 2) (Figure 2)

(Figure 3)

(Figure 3)

Min. Setback—

Downdraft

Cooktop

Cooktop

Depth

Front Edge

Min. Req’d.

Cooktop

Cooktop

Add’l Depth

Cutout Width

Overall

Overall

Vent

Cktop +

Cntrtop to Front

Inside Cabinet

Cutout

Cutout

Req’d for

Req’d from

Model No.

Width

Depth

Depth

D.D. Vent

Edge of Cutout

Clearance

Width

Depth

Downdraft

Centerline

JP300
JP301
JP310

30-1/4

21-1/4

2

23-1/4

3-1/2

22

28-1/2

19-1/2

2-7/8

27-1/16

JP311
JP325

JP332
JP333

30

21

2

23

3-1/4

22

28-1/2

19-1/2

2-5/8

27-1/16

JP343
JP345

29-3/8

20-1/2

2

22-1/2

3

22-1/16

28-9/16

19-9/16

2-3/8

27-1/16

JP347

JP392
JP393

30

20-3/4

2

22-3/4

2

22-7/16

29-1/8

19-15/16

2-5/16

27-1/16

JGP330
JGP331

30

21

2

23

3-1/4

22

28-1/2

19-1/2

2-5/8

27-1/16

JGP334

*Required to maintain UL or AGA approvals.

6

Advertising
This manual is related to the following products: