Pre-operation inspection – Genie Z34N-2100 Z-34 User Manual

Page 13

Advertising
background image

Part No. 43654

Genie Z-34/22 & Genie Z-34/22N

11

Operator's Manual

Second Edition • Ninth Printing

Pre-operation Inspection

!

Be sure that the operator's, safety and

responsibilities manuals are complete, legible
and in the storage container located on the
platform.

!

Be sure that all decals are legible and in place.

See Decals section.

!

Check for hydraulic oil leaks and proper oil level.

Add oil if needed. See Maintenance section.

!

Check for battery fluid leaks and proper fluid

level. Add distilled water if needed. See
Maintenance section.

Check the following components or areas for
damage, modifications and improperly installed or
missing parts:

!

Electrical components, wiring and electrical
cables

!

Hydraulic power unit, tank, hoses,
fittings, cylinders and manifolds

!

Drive and turntable motors and drive hubs

!

Boom wear pads

!

Tires and wheels

!

Limit switches, alarms and horn

!

Nuts, bolts and other fasteners

!

Platform entry mid-rail bar or gate

PRE-OPERATION INSPECTION

Check entire machine for:

!

Crack in welds or structural components

!

Dents or damage to machine

!

Be sure that all structural and other critical

components are present and all associated
fasteners and pins are in place and properly
tightened.

!

Be sure that both battery packs are in place,

latched and properly connected.

!

After you complete your inspection, be sure that

all compartment covers are in place and
latched.

Advertising
This manual is related to the following products: