Load platform, Ladder setup (if equipped), Function tests – Genie GL-12 User Manual

Page 13: Setup, Boom

Advertising
background image

Part No. 35566

Genie Lift

11

Operator's Manual

First Edition • Sixth Printing

FUNCTION TESTS

Load Platform

1 Lay the load platform onto the forks.

2 Lift the front of the load platform and push it

toward the carriage until the back angle is under
the lower fork mounting tube.

3 Rotate the load platform down until it locks into

place over the forks.

Ladder Setup (if equipped)

1 Position the machine.

2 Pull the snap pins on both sides of the ladder.

3 Pull the ladder down into the lowered position.

Be sure to support the ladder until it is fully
lowered.

To store the ladder: Raise the ladder to the stowed
position and be sure the snap pins lock into place.

Function Tests

1 Select a test area that is firm, level and free of

obstructions.

Setup

1 Tilt the machine back.

2 Slide each fork onto the carriage and secure it

with the fork lock pins.

3 Slide each leg into

a base socket until
the leg lock pin
snaps into the leg.

4 Stand the machine up.

5 Remove the winch handle, reverse the handle

and install it. The handle grip should face the
operator.

6 Straddle base: Adjust to desired width. Be sure

the leg lock pin snaps into the leg.

7 Rotate the hold-down bar off of the carriage.

Boom

1 Hold the boom in a vertical position.

2 Place the top of the boom plate under the upper

fork mounting tube and lift up.

3 Rotate the boom down until it locks into place.

4 Attach the lifting shackle to the desired hole on

the boom.

Advertising
This manual is related to the following products: