5 use of s4 and s5 dip switch, 6 use of cv jumper, 5 use of s4 and s5 dip switch 3.6 use of cv jumper – GE CS300 User Manual

Page 19

Advertising
background image

CS300

——————— Half controlled power supply for inverter DC-Link ————————

19

1) Set all the switches in off position (18-seconds ramp time), use a current probe able to detect a current

peak

≤≤≤≤≤

10mS between the C or D terminal of the DC-LINK.

2) At this point read the measuring of the maximum peak current present on the DC-LINK during the precharging

phase.

3) If the measured peak current is much lower than twice the value of the CS300 rated current, it is possible to

select the switch for a lower ramp time (SW3.4 - 8- second ramp time). Go back to point 2.

Such operation will be repeated till the measured peak current is equal or lower than twice the value of the
converter rated current.

3.5 USE OF S4 AND S5 DIP SWITCH

The S4 and S5 dip switches are used to select the AC mains frequency.

AC Mains frequency

S4

S5

50 Hz (Default)

OFF

OFF

60 Hz

ON

ON

cs110

3.6 USE OF CV JUMPER

(See the ML signal function)

With “CV” jumper mounted (on), the signal available on the terminal 36 will be LOW with AC mains voltage
lower than the undervoltage threshold (see figure 3). It will be HIGH, with AC mains voltage higher than the
undervoltage threshold.

With “CV” jumper open (off), the signal on the terminal 36 will indicate, with an impulse of about 150ms, (low
level signal) that the power supply voltage has had a transition at a level lower than the undervoltage threshold.

Advertising