Diagrams for vertical venting – Munchkin VWH High Efficiency Hot Water Supply Boiler User Manual

Page 18

Advertising
background image

18

VENTING

DIAGRAMS FOR VERTICAL VENTING

Figure 4-5: Roof Vent with tee (intake) & coupling

(exhaust) for standard floor units

3” piping for 199VWH
4” piping for 399VWH

**IMPORTANT NOTE: All vent pipes must be glued, prop-
erly supported and the exhaust must be pitched a mini-
mum of a ¼" per foot back to the boiler (to allow drainage
of condensate). Always increase pipe in vertical position.
Never increase pipe size in horizontal position.

Figure 4-6: Roof Vent with 3” concentric vent kit

(KGAVT0601CVT) for standard floor
units

3” piping for 199VWH

**IMPORTANT NOTE: All vent pipes must be glued, prop-
erly supported and the exhaust must be pitched a mini-
mum of a ¼" per foot back to the boiler (to allow drainage
of condensate). Always increase pipe in vertical position.
Never increase pipe size in horizontal position.

Advertising